Amy Ridge & Hiram Clark Lift Station Elimination

Gunda Corporation provided design services for 7,150 LF of 10-inch to 24-inch sanitary sewer relief lines, which are mainly through residential neighborhoods, for this wastewater project to eliminate two lift stations and divert the flows to a new lift station. The two lift station systems are tied together and the flows are brought to the new lift station.  Demolition plans were prepared to eliminate the two lift stations after salvaging all the useful parts. The scope of work also included a deep channel crossing which was designed to be accomplished by tunneling under the channel.