Cypresswood Drive Widening

This project includes the construction of two westbound lanes with a 32-foot median to complete a full boulevard roadway section. Gunda Corporation’s scope includes roadway horizontal and vertical geometrics, traffic control, utility conflict resolution, storm sewer hydrology and hydraulic design, signing and pavement marking layouts, widening of the existing bridge over Harris County Flood Control District Channel No. K159-00-00 and concrete slope stabilization of the channel under the bridge. The project is approximately 2,000 feet in length.